top of page
Writer's pictureJohn

2018 Winter projects list

With the end of the sailing season of 2018 it is time for some intensive care of The Dream, after all our yacht has just turned 5 years old, 2 of them already in our possession, and although we do care for The Dream on a regular basis the reality is that while we are travelling not all areas get the full attention they deserve.

So our 6 month in Tunisia is the perfect opportunity to show that love and to care for it, going through a major cleaning job and servicing tasks, luckily the repair list is small and mostly related to cosmetic issues, but still a lot to be inspected.

Below is a summary of the jobs in hands, and this list may be updated as we go through our inspections and works.

Stainless steel works

- Stanchions - clean, polish and re-bed to deck

- Pushpit - clean and polish

- Pulpit- clean, polish, re-bed to the deck, reinforce deck structure

- Clean and polish Bimini frame and supports

- Clean and polish bow roller and associated fittings

- Clean cable stay bases and provide rust inhibitor (remove rust stains - refer to fibreglass works)

- Remove clean and refit bbq hinges, provide rust inhibitor (remove rust stains - refer to fibreglass works)

- Remove clean and refit deck ladder supports, provide additional fibreglass in support screw holes

- Remove and clean front locker hinges, repair fibreglass surround, provide rust inhibitor (remove rust stains - refer to fibreglass works)

- Consider additional rail support and possible seat design in teak refer teak works.

- New helm bars and cup holders mountings to helm base

- New stainless steel/acrylic solar panel supports. Design to be considered

- Reinforcing for Bimini structure for the solar panels upgrade

- Additional lifeline fixing points in the cockpit

Fibreglass repairs

- Gel coat repair to back corner points

- Gel coat repair in the cockpit at sprayhood base

- Gel coat repair to general areas (punch list needed - scratches, dents, rub marks) on deck and broadsides including bow

- Gel coat repair on back platform sides

- Remove spot rust stains throughout deck zone and sideboards and clean

- Consider hairline cracks around deck and possible patching and refinish

- Clean and prepare back hull deck joint and recaulk

- Buff and polish broadsides with Rupes buffing system.

Teak works

- Dingy support frame front and back, mount system to the deck

- Scrub with a brush all the teak decking and rails till clean using salt water and fresh water rinse

- Teak entry side rails

- Teak swim ladder steps

- Teak support box to the front of centre cockpit table

- Teak bow seat

- Consider making the cockpit sink lid in two hinged pieces


Dingy works

- Repair port side tubes air leak

- Fix damaged covers

- Clean dingy and check hull - repair as required

- Make padded seat covers

- Consider bow section flooring for puppy

- Motor clean inside and out

- Remove fuel from the engine

- Oil change

- Grease and oil fittings

Hull/underwater

- Antifoul clean or repaint

- Sail drive and propeller clean

- Replace anodes

- Check rust bulb on the keel

Deck hardware

- Tighten and clean all stanchions rings

- Service winches and jammers

- Tighten deck cleats

- Service travellers dismantle clean, oil and reassemble

- Backstay anchor points require caulking at deck joint to ensure watertight

Running rigging

- Deck lines all soaked in fresh water and softener till clean roll and pack

- Remove all unused lines and mouse where possible

- Install new Genoa halyards

- Install new furling line for Genoa

- Add restraint line for furling line to ensure it doesn’t get caught on the windlass

- Review boom topping lift configuration and install new Dyneema line with the line into blocks and jammers

- Fix flag ropes repair or replace lines

Interiors

- Clean all hatches inside and out, lubricate hinges and clean hold rods

- Clean all blinds

- Wipe down all internal woodwork, protect

- Wash all cushion covers

- Clean all bilges, vacuum and wipe clean

- Construct new shelves and dividers in the kitchen and bedrooms

- Clean all carpets

- Redesign main bathroom countertop shelve unit

Sails/standing rigging

- Mast check and cable stay clean

- Remove Genoa and store clean track and furling assembly

- Clean cable stay and provide rust inhibitor (remove rust stains - refer to fibreglass works)

- Repair Genoa

Anchor

- Clean and inspect windlass check gipsy

- Clean chain locker

- Review chain counter markers and replace as required

- Rinse chain with fresh water ensure all salt is removed

- Inspect and grease Mantus swivel

- Swap bolts on mantus anchor misplacement

Engine Dougie

- fuel filter change, both filters

- Coolant change, five-year change

- Grease all movement points

- Disassemble exhaust and check SS works ensure no corrosion

- Clean under exhaust inside Hull

- Top up oil confirm next programmed oil change

- Remove and clean air filter

- Check engine anode and verify if it needs replacing

- Check sail drive oil levels top up as required

- Reorganise exhaust vent locations and build isolation frame

Outdoor fabrics/covers/cushions

- New sprayhood front cover with Velcro adhesion strips

- New deck wing covers from existing cover materials and add connection points

- New cushions to design intent

- Fix bottom trims of Bimini side covers and add additional bracing straps

- Additional seats for the helm stations

Electrical

- Battery space clean and battery voltage check

- Additional red night light in the cockpit

- Additional warm white night light in the cockpit

- Additional red night light in the salon, in the same location as existing warm white LED strips (floor light and ceiling light)

- Replace existing warm white LED strips in the salon (floor light and ceiling light)

- Additional warm white night light in the galley connected to the same grid as the salon (floor light and under cupboard light)

- Additional warm white night light in the bedroom

- Fix radio connection to the antenna

- Check and fix speaker wires behind the radio

- Clean up and tidy wiring behind nav station

Fridges

- Insulate cold wiring at freezer unit

- Build additional insulation box for freezer

- Further, insulate the main fridge and inspect for additional temperature bridges

- Additional insulation box for the outdoor fridge

Others

- Construct new floor in rear locker to level floor with marine plywood

- Clean Hydrovane and remove re-antifoul the rudder ready for next season. Check bolts and backing plate for security

- Additional support for rear fold down seats on the stern

- Clean bbq tray, drain bucket, plate cover and inspect all fittings

- Service and inspect steering system and cable work, lubricate wheels etc.

- Review back platform support method and reinstall as required

- Clean all windows, clean caulking of mould polish windows


0 comments

Comments


bottom of page