Coppercoat antifoul treatment - preparation & application (part 2)
This stage of the preparation of the hull was not only backbreaking but also psychologically challenging.
Coppercoat antifoul treatment - preparation & application (part 2)
Coppercoat antifoul treatment - considerations and costs (part 1)
Building a hardtop - costs, other numbers and conclusions (part 6)
Building a hardtop - stainless steel works and installation of equipment (part 5)
Building a hardtop - joining the pieces and painting (part 4)
Building a hardtop - fairing (part 3)
Building a hardtop - the construction (part 2)
Building a hardtop - the idea, concept and material choices (part 1)
Rigid solar panels - here we go
Solar panels - what's next?
Flexible solar panels - second season of use update
How we power our batteries - solar energy
The Dream - LiFePo4
Batteries failure - what went wrong!
Replacing the batteries and running 220/240v full time
Transat - Repairs off the beaten track and another lesson learned - part 3
Transat - Repairs off the beaten track and another lesson learned - part 2
Transat - Repairs off the beaten track and another lesson learned - part 1
Transat - the Hydrovane and the jury rig
Galley mini-refit - Gimballed induction cooktop and convection oven
2019 Winter projects list
Increasing the Diesel capacity
Warming up for a winter at anchor
EPIRB, PLB, MOB devices - what are they, how do they work and what do we have
2018 Winter projects list - what was really done
Making the cockpit feel like home - cushions
How to repair your Solar Panels
The ongoing bow thruster dramas
2018 Winter projects list
How we steer just with wind
How we replaced our seized rudder bearing assembly (part 1)